Question #1: A reliable system will be one that:

Answer is  B. Is unlikely to cause a failure

Question #2: Cyclomatic Complexity method comes under which testing method.

Answer is A. White box

Question #3: Which of these can be successfully tested using Loop Testing methodology?

Answer is D. All of the above

Question #4: The purpose of requirement phase is

Answer is D. All of the above

Question #5: If an expected result is not specified then:

Answer is  C. It may be difficult to determine if the test has passed or failed

Question #6: Equivalence partitioning is:

Answer is C. A black box testing technique appropriate to all levels of testing

Question #7: Software testing accounts to what percent of software development costs?

Answer is B. 40-50

Question #8: Which of the following is not a characteristic for Testability?

Answer is D. Robustness

Question #9: Inspections can find all the following except

Answer is D. How much of the code has been covered

Question #10: Which of the following statements about component testing is not true?

Answer is D. Component testing does not involve regression testing

Question #11: Which of the following is not a static testing technique

Answer is A. Error guessing

Question #12: To test a function, the programmer has to write a___________, which calls the function and passes it the test data.

Answer is B. Driver

Question #13: The inputs for developing a test plan are taken from

Answer is A. Project plan

Question #14: What is the difference between testing software developed by contractor outside your country, versus testing software developed by a contractor within your country?

Answer is B. Cultural difference

Question #15: During which test activity could faults be found most cost effectively?

Answer is   C. Planning

Question #16: When a new testing tool is purchased, it should be used first by:

Answer is A. A small team to establish the best way to use the tool

Question #17: Test are prioritized so that:

Answer is B. You do the best testing in the time available

Question #18: Defect Management process does not include

Answer is B. Deliverable base-lining

Question #19: Independent Verification & Validation is

Answer is  D. Done by an Entity Outside the Project’s sphere of influence

Question #20: Which one of the following are non-functional testing methods?

Answer is D. Both B & C